Tunnel Long-Distance Step-Up Transformer | Construction Site Booster
Oil-immersed booster for voltage-drop compensation on long tunnel feeders
HK$3000.00
Overview
Nelink tunnel step-up transformers solve the severe voltage drop caused by long cable runs in tunnel, mining and remote-site construction, boosting and stabilising supply so equipment at the working face receives its rated voltage. Available as bare oil units or integrated into weatherproof outdoor cabinets.
Key Features
Compensates voltage drop over long feeders, stabilises equipment supply
Step-up configurations such as 0.4 kV to 10 kV, or custom ratios
Oil-immersed rugged design for continuous heavy site duty
Optional IP54 outdoor cabinet with meters and switchgear
High overload capacity for motor starts and impact loads
Technical Specifications
Type | oil-immersed step-up / booster |
Voltage class | 6 / 10 kV (custom ratios) |
Capacity | project-rated |
Cooling | ONAN |
Enclosure option | IP54 weatherproof cabinet |
Frequency | 50 Hz |
Standard | IEC 60076 |
Applications
Tunnel boring and construction sites, mines, dams, long conveyor lines and remote works with long cable distances.
Ordering & Support
Tell us line length, cable size, load power and required end voltage. Contact levit@nelink.net or WhatsApp +86 15622712297 for sizing and a quotation.
Wenzhou Nelink Trading Co., Ltd.
Factory-direct medium and high-voltage power distribution equipment built to IEC standards.
SITEMAP
Home
Shop
About
News
Contact us
FACTORY & RFQ
levit@nelink.net
+86 15622712297
Building A, PanShi Industrial & Trade City
Yueqing, Wenzhou, Zhejiang, China
Project requirements reviewed before quotation.
© 2026 Wenzhou Nelink Trading Co., Ltd.-Factory-direct medium and high-voltage distribution equipment for global power utilities and EPC contractors.
IEC STANDARD POWER DISTRIBUTION EXPORT
